Back to overview
Lot

LOT-44816

In good standing
Beef Trim 85CL
Origin
Brazil · Santos
Supplier
Marfrig Global Foods
Weight
44,800 lbs
Vessel / Container
Maersk Algol · V.512E
MSKU-3318822
Received
Mar 10, 2025 · 09:21 CST
Use by Apr 18, 2025
Current Temp
30°F
Freezer 4 · Rack B-12

Raw → Finished Progress

Current stage highlighted; completed stages filled

Now at Cold Storage
  1. International Inbound
  2. USDA Inspection
  3. Receiving
  4. Processing Floor
  5. Cold Storage
  6. Customer Shipping

Inventory Movement

Weight in pounds at each stage. Dashed = projected based on standard yield curves.

Raw inbound
44,800 lbs
At current stage
38,707 lbs
Cumulative loss
6,093 lbs · 13.6%
011K22K34K45K45KInternationalInbound44KUSDAInspection44KReceiving39KProcessingFloor39KColdStorage0CustomerShipping
StageWeight (lbs)Δ vs priorRetentionState
International Inbound44,800100.0%Actual
USDA Inspection44,442−35899.2%Actual
Receiving44,352−9099.0%Actual
Processing Floor38,707−5,64586.4%Actual
Cold Storage38,707+086.4%Actual
Customer Shipping0−38,7070.0%Projected

Lifecycle Timeline

Every movement, inspection and handoff for LOT-44816

  1. International Inbound
    Loaded at origin port
    Feb 22, 2025 · 04:10 local
    Supplier Logistics
    Origin Terminal Full container

    Container sealed. Reefer set to 28°F.

  2. International Inbound
    Vessel departed
    Feb 23, 2025 · 18:30 local
    Ocean Carrier
    En route to Houston

    GPS + reefer telemetry streaming.

  3. International Inbound
    Arrived Port of Houston
    Mar 10, 2025 · 11:04 CST
    Bayport Container Terminal
    Bayport Terminal

    Customs cleared in 19h.

  4. USDA Inspection
    FSIS import re-inspection passed
    Mar 10, 2025 · 22:15 CST
    Inspector R. Cole
    Plant 1 · Bay A

    All cartons cleared. No defects.

  5. Receiving
    Received at dock — LOT-44816
    Mar 11, 2025 · 06:42 CST
    R. Mendoza
    Plant 1 · Dock 2 Full lot

    Pulp temp 33.1°F. 1,604 cartons.

  6. Receiving
    Putaway to staging cooler
    Mar 11, 2025 · 08:55 CST
    Auto-WMS
    Cooler 1 · Rack C-04

    Awaiting production schedule call-off.

  7. Processing Floor
    Released to Line 3
    Mar 14, 2025 · 06:42 CST
    Foreman J. Reyes
    Line 3 · Grinding

    Yield run started. Target 87.4%.

  8. Cold Storage
    Finished cartons moved to freezer
    Mar 15, 2025 · 11:18 CST
    Auto-WMS
    Freezer 4 · Rack B-12

    Blast frozen to 0°F before storage.

Current Location

Live from WMS

Freezer 4 · Rack B-12
Cold Storage
Temp
30°F
Dwell
1.4 d

Inspections

1 on file
  • FSIS import re-inspection passed
    Mar 10, 2025 · 22:15 CST · Inspector R. Cole

Documents

  • Commercial Invoice
    PO-2025-08795
  • Bill of Lading
    MSKU-3318822
  • Certificate of Analysis
    COA-44816
  • FSIS Import Form 9540-1
    9540-44021